Community Facility of Jamsil Jinju Apartment, Songpa-gu, Seoul, South Korea

  • Gebouwtype:
  • Winkelcentra
Volledig Scherm Sluiten

This project applied a dry joint system to the stair core of the community facility within the apartment complex.

The construction-stage analysis was divided into three phases: after core element installation and before grout curing, after grout curing, and finally the stage where the core interacts with the main structural system. The construction was completed quickly and safely.

Projectinformatie

Projectontwikkelaar:
Samsung C&T Corporation
Aannemer:
Samsung C&T Corporation
Ingenieursbureau:
RISE STRUCTURAL ENGINEERING
Architect:
TAEHWA ENGINEERING CO., LTD (SHOP DESIGN)
Prefabbeton producent:
KC INDUSTRY
Geleverd:
2023
Opgeleverd:
2023