Eikenott, Gland, Switzerland

  • Gebouwtype:
  • Appartementen en woningen
  • Parkeergarages
Volledig Scherm Sluiten Street View

Peikko provided an efficient construction method for Eikonott Gland. Speed and technically advanced details convinced the total contractor Losinger-Marazzi to use Peikko's Column Connection solution. Solution consisted of HPKM®-Column Shoes and HPM® Anchor Bolts which were used in oval shape columns. 

Peikko's Column Shoes were helpful in speeding up the whole construction process. Now building seems almost like a LEGO-game.

Bertrand Faucherre, Didier Bourqui

Projectinformatie

Projectgrootte:
20 000 m2
Verdiepingen:
4
Aannemer:
Losinger-Marazzi
Prefabbeton producent:
Bétontec
Geleverd:
2012
Opgeleverd:
2014

Toegepaste Peikko oplossingen

Contact

Gregor SCHABRUN

Gregor SCHABRUN

Geschäftsführer

Mob. +33 (0)6 40 75 85 34
[email protected]