Hartaansilta Bridge, Oulu, Finland

  • Gebouwtype:
  • Infrastructuur
Volledig Scherm Sluiten

Hartaansilta is the new landmark of Oulu

A new landmark has emerged in the cityscape of Oulu, connecting the two residential areas in the city. Currently under construction, the bridge is set to be completed by the summer of 2025. The bridge’s tension rods are of Peikko’s BESISTA® system.

The visually striking design of the bridge is inspired by the lightweight, bird-like form, which creates a silhouette in the delta landscape of the Oulujoki River. From a technical perspective, the two-cable bridge is an advanced structure. The 170-meter-long and 4.5-6.2-meter-wide bridge pathway elegantly curves in the shape of the letter "S."

“BESISTA® is a perfect solution for this type of aesthetic project because it stiffens the structures in both a stylish and efficient way,” says Peikko Finland’s Business Manager, Topi Laiho.

In coastal infrastructure projects, products are required to be durable and low-maintenance. According to Laiho, the hot-dip galvanized rods and threads of BESISTA® ensure long-lasting protection against corrosion.

Lees verder down-arrow.png

Projectinformatie

Projectontwikkelaar:
City of Oulu
Aannemer:
YIT
Architect:
Insinööritoimisto Pontek Oy
Geleverd:
2024
Opgeleverd:
2025

Toegepaste Peikko oplossingen

Contact

Topi Laiho

Topi Laiho

Product Manager

Bolt Connections

Mob. 040 776 2503
[email protected]