The Internal Security Force of Qatar (ISF) is building a camp at on the outskirts of Doha. This camp, located in Duhail area, will cover an impressive four million square meters in total. Peikko delivered PVL® loops on the site.

The ISF project features more than 330 individual building units made up of several different types of purpose-built facilities. The camp is planned to have an ultimate resident population of more than 17 000 and it is expected overall completion date is in 2025. Besides residential buildings, the area will include post office, unit force offices, unit guardhouses, check points, a five-star hotel and a 10 000 spectator stadium.

The ISF camp development is the first project in Qatar which has been targeted to achieve the QSAS Neighborhood Certification. QSAS is the ‘Qatar Sustainability Assessment System’, a new classification which aims to promote sustainability in construction and encourage sympathy between new developments and their surrounding areas.

Lees verder down-arrow.png

Projectinformatie

Projectgrootte:
306000 m2
Projectontwikkelaar:
State of Qatar Internal Security Force
Aannemer:
Alsina, QD-SBG Construction
Ingenieursbureau:
Aktor S.A.Aljaber Engineering JV, Qatar Project Management
Architect:
Arab Engineering Bureau
Prefabbeton producent:
SMEET, QD-CPC Industries W.L.L.
Geleverd:
2013
Opgeleverd:
2025