The anchoring of the columns with the foundations was realized using the Peikko® anchor system. 

The main primary prefabricated beams were placed on the column corbels and were connected to the columns using BECO® beam shoes and COPRA® anchoring couplers. 

Projectinformatie

Projectontwikkelaar:
Mondi SCP, a. s.
Aannemer:
STRABAG Pozemné a inžinierske staviteľstvo s.r.o.
Ingenieursbureau:
STAT-KON s.r.o.
Prefabbeton producent:
STRABAG Pozemné a inžinierske staviteľstvo s.r.o.
Geleverd:
2019
Opgeleverd:
2020