This 225000/63000V substation is part of the renovation program of the high durability electric transmission network.

PETRA® slab hangers are being utilized so that the honeycombed tiles can be laid swiftly without having to be supported.

 

Architectual visualisations © Mrs. Agnès Canu, for RTE project management, the ITEA project manager.

A quick installation with no need for supports to create slab hangers.

Mr Mehira, Chef de chantier.

Projectinformatie

Projectontwikkelaar:
RTE
Aannemer:
STAM
Ingenieursbureau:
RTE
Architect:
ITEA. Mme Agnès CANU
Prefabbeton producent:
KP1
Geleverd:
2020