At the core of this monumental project lies a unique engineering challenge: the deepest top-down construction site in the region, reaching an impressive 24 meters underground with 7 flat slab levels and a massive raft foundation.
Initially designed with S355 reinforcement, the project faced time-consuming fabrication and slow on-site execution. That’s when Peikko made the difference.
With a swift redesign and the implementation of Peikko’s PSB® Punching Reinforcement system, the project turned a corner, substantially reducing production complexity and speeding up delivery and installation. The use of D25 PSB® Punching Reinforcement over 2 meters high in the deep foundation ensured uncompromised strength and stability while enabling faster progress on site.
From tedious to streamlined, from delayed to accelerated, Peikko delivered time, efficiency, and trust in one of the most ambitious construction sites in the region. A new benchmark in how the right solution can redefine construction speed and performance.