Stadium Bata

  • Gebouwtype:
  • Sportstadions
Volledig Scherm Sluiten

The Estadio de Bata, the largest stadium in Equatorial Guinea, underwent timely modifications before the commencement of the 2012 African Cup of Nations. These alterations involved the incorporation of approximately 1,800 BESISTA® tension rod systems, which served as stabilizing and bracing assemblies.

Situated in close proximity to the coast, the stadium now offers covered seating for over 35,000 spectators. In addition to the football pitch, the venue includes track-and-field facilities, an indoor pool, and a hotel.

The tension rod systems were directly supplied by the manufacturer, BESISTA®, without the involvement of intermediaries. BESISTA® played an early role in the design and sizing of the steel construction, providing drawings, technical data, and technical approval. This collaboration helped optimize the utilization and cost-effectiveness of the BESISTA® rod systems.

By directly communicating with the design team, potential errors and misunderstandings were eliminated, while the delivery time for the hot-dip galvanized BESISTA® tension rod systems was reduced. BESISTA®'s packaging concept further enhanced efficiency: each package included installation instructions in multiple languages, ensuring maximum safety during the assembly process.

Lees verder down-arrow.png

Projectinformatie

Aannemer:
NÜSSLI Group; MMS, DE-Rudolstadt
Ingenieursbureau:
Markus Wacker, DE-Ulm
Architect:
Bouygues Bâtiment a. NÜSSLI Group

Toegepaste Peikko oplossingen

Contact

Štefan Gavura

Štefan Gavura

Product Manager

Punching Prevention Systems, Rebar Coupling Systems

Mob. +421 911 250 080
[email protected]